The Base Engineering Team has concluded its investigation into the network outages on June 25 and 26, identifying a bug in the sequencer's block-building logic as the root cause. This flaw led to the creation of blocks with invalid state transitions, resulting in a temporary halt in block production. Despite the disruption, the team confirmed that user funds remained secure and the integrity of the blockchain was not compromised.